Client: Karachaganak Petroleum Operating (KPO B.V.)
Contractor: JS Company "Montazhspetsstroy"
Construction area: West Kazakhstan region, Aksai, Republic of Kazakhstan
Man-hours worked: as of 18.06.2026, mobilization is underway
Period of work: 05.05.2026 – 05.05.2031
Scope of work: Earthworks and concrete works; fabrication and erection of steel structures; pipe spool prefabrication and pipeline installation, including piping valves; non-destructive testing of welded joints; pipeline testing; painting works, thermal insulation, passive fire protection; installation of static and rotating equipment; electrical, instrumentation and telecommunications works.