UI182589 Engineering, Procurement and Construction Services: Debottlenecking of the Kashagan Onshore Facilities for the Phase IIA Project

Client: North Caspian Operating Company (NCOC)

Contractor: JS Company “Montazhspetsstroy”

Construction area: Kashagan field

Man-hours worked: 148,790 man-hours Period of work: 21.07.2025-21.10.2026

Scope of work: Debottlenecking modifications to increase production to 500,000 barrels of oil per day, to be carried out during the 2026 planned turnaround (TAR), including demobilization. · Onshore complex debottlenecking (Scope during TAR 2026): (DBN-11B (onshore complex thermowells); DBN-21 (onshore complex utility systems); DBN-22 (onshore complex pressure letdown); DBN-23 (naphtha unit upgrade); DBN-24 (Merox naphtha treating unit revamp); DBN-25 (Merox LPG unit upgrade); DBN-33 (onshore CTG and inlet oil separator) · Pipeline tie-ins (Scope during TAR 2026). The WORKS include development of the detailed design, procurement of materials, shop fabrication/pre-assembly, transportation to site and installation of replacement shut-off/control valves and vessel internals, piping and fittings modifications, replacement of components, painting of internal and external surfaces, cladding, installation of insulation, including all necessary testing and inspection.

CONNECT WITH US