291/1, Tole bi str., 050031,
Almaty, Republic of Kazakhstan

Procurement, fabrication, load-out and transportation of topside for ep cluster 4

Client: North Caspian Operating Company (NCOC). 

Contractor: Consortium: “Kazakhstan Caspian Offshore Industries” (KCOI) – JS Company “Montazhspetsstroy”.

Construction area: Republic of Kazakhstan, Karabatan station, Eskene West, Atyrau oblast

Construction period: 08.06.2017 - 31.05.2021     

The Scope of Work includes:

Procurement, Fabrication, Load-out and Transportation:

  • Topside Production Manifold module;
  • Prefabricated Off Module spools and Off module items;
  • Transportation aids for the module and associated topside Off Module items.

CONNECT WITH US