CONSTRUCTION OF THE CAMP FOR 460 PEOPLE ON “TURNKEY” BASIS

Client: Zhaikmunai LLP

Contractor: JS Company “Montazhspetsstroy”

Construction area: West Kazakhstan oblast, Zelenovskiy district, Chinarevskoye field

Construction period: 2012-2014  

Scope of Work includes detailed engineering design, supply of materials and construction and installation works, commissioning and start-up, including:

  • civil work (earthwork, concrete work, road construction);
  • erection of building frame steel structures;
  • installation of roof and wall cladding;
  • finishing;
  • installation of piping system;
  • installation of HVAC utilities;
  • installation of internal and external cold/hot water supply utilities, sewage system;
  • electrical, painting;
  • installation of instrumentation, communication, fire detection and fire-fighting systems.

In addition, steel structures of Boiler House and fire-fighting equipment building have been fabricated by own resources.

Total number of man-hours liquidated under the Contract – 976,074 man-hours