DUNGA PHASE II – SEA WATER INTAKE STATION AND WATER PIPELINE

DUNGA PHASE II – SEA WATER INTAKE STATION AND WATER PIPELINE

Contract No D-EPC-8600003050 for Engineering, Procurement, Construction and Commissioning “Dunga Phase II – Sea Water Intake Station and Water Pipeline”

Client: Maersk Oil Kazakhstan GmbH

Contractor: JS Company “Montazhspetsstroy”

Construction area: Dunga field, Tupkaraganskiy district of Mangystau oblast

Construction period: April, 2014 to September, 2016  

Project “Dunga Phase II – Sea Water Intake Station and Water Pipeline” includes the following facilities:

  • Beach infiltration trench;
  • Pump well;
  • Booster Pump House;
  • Surge Tank for booster pumps;
  • Diesel Fuel Tank;
  • Chemical Injection Skid;
  • Access road;
  • Sea Water Pipeline from SWIS to Dunga Field (South Plant) of 16 km length (Ø16" pipeline)

Scope of Work includes:

  • engineering;
  • procurement and supply of main and auxiliary equipment and materials;
  • construction and installation works, including earthwork, foundations, erection of tank and building steel structures;
  • installation of power supply utilities; testing and commissioning