DUNGA PHASE II – POWER PLANT
Contract No D-EPC-8600002852 for Engineering, Procurement, Construction and Commissioning “Dunga Phase II – Power Plant”
Client: Maersk Oil Kazakhstan GmbH
Contractor: JS Company “Montazhspetsstroy”
Construction area: Dunga field, Tupkaraganskiy district of Mangystau oblast
Construction period: February, 2014 to April, 2016
Project “Dunga Phase II – Power Plant” includes the following facilities:
- Four Gas Turbine Units, 5.5 MVA each (total capacity 22 MVA);
- Oil cooling packages;
- Diesel fuel tanks (2 VSTs V=100 m3);
- Diesel fuel discharge area;
- Pump station for Diesel fuel supply to GTU;
- Underground drain vessel, V= 8 m3;
- Air compressor;
- Control room;
- Diesel generator;
- 5.5kV and 0.4kV switchgears;
- Power transmission lines
Scope of Work includes:
- engineering;
- supply of all equipment and materials, except GTU (Client’s responsibility);
- construction and installation works, including earthwork, foundations, steel structures of tanks, piperacks and buildings, GTU area fencing;
- installation of static and dynamic equipment;
- electrical, instrumentation, telecommunication, F & G, alarm systems;
- testing, pre-commissioning and commissioning