Dunga. Phase II - Power Plant

DUNGA PHASE II – POWER PLANT

Contract No D-EPC-8600002852 for Engineering, Procurement, Construction and Commissioning “Dunga Phase II – Power Plant”

Client:  Maersk Oil Kazakhstan GmbH

Contractor: JS Company “Montazhspetsstroy”

Construction area: Dunga field, Tupkaraganskiy district of Mangystau oblast

Construction period: February, 2014 to April, 2016      

Project “Dunga Phase II – Power Plant” includes the following facilities:

  • Four Gas Turbine Units, 5.5 MVA each (total capacity 22 MVA);
  • Oil cooling packages;
  • Diesel fuel tanks (2 VSTs V=100 m3);
  • Diesel fuel discharge area;
  • Pump station for Diesel fuel supply to GTU;
  • Underground drain vessel, V= 8 m3;
  • Air compressor;
  • Control room;
  • Diesel generator;
  • 5.5kV and 0.4kV switchgears;
  • Power transmission lines  

Scope of Work includes:

  • engineering;
  • supply of all equipment and materials, except GTU (Client’s responsibility);
  • construction and installation works, including earthwork, foundations, steel structures of tanks, piperacks and buildings, GTU area fencing;
  • installation of static and dynamic equipment;
  • electrical, instrumentation, telecommunication, F & G, alarm systems;
  • testing, pre-commissioning and commissioning