CONTRACT “ELECTRICAL, INSTRUMENTATION AND TELECOMMUNICATION WORKS IN SULPHUR AREA TRANCHE 1, 2 AND 3”

Client: Agip Kazakhstan North Caspian Operating Company N.V. (Agip KCO)

General Contractor: Consortium Bonatti S.p.A – JS Company “Montazhspetsstroy” (MSS portion - 50%)

Construction area: Eskene West, Atyrau oblast, Republic of Kazakhstan

Construction period: 2009 – 2012    

DETAILED SCOPE OF WORK includes, but is not limited to:

Procurement of materials, including:

Supply of auxiliary materials for Electrical, Instrumentation, Telecommunication works (but not limited to: Unistrut, fixing material, labels, tags, warning tape, protective tile, markers, signs, supporting steel structures, painting material, etc.)

ConstructionandInstallation, including:

  • civil work (excavation and backfilling for underground cabling) –  9,100 m3;
  • installation of metal tray system for electrical cable – 115,000 m;
  • installation of electrical cable (power, feeding, lighting, heat tracing, grounding, etc.) – 1,774,000 m;
  • installation of electrical equipment – 2,420 units;
  • installation of electrical apparatus – 9,860 units;
  • installation of secondary trays for Instrumentation and Telecom cables – 48,170 m;
  • installation of Instrumentation and Telecommunication cables – 990,800 m;
  • installation of fiber optic cable – 96,100 m;
  • installation of Instrumentation and Telecommunication equipment – 7,950 units
  • number of the prepared as-built documentation under the Contract (Mechanical Completion Dossier, Quality Dossier, RoK Regulations Dossier, General Dossier) – 2,790 documents

Total number of man-hours liquidated under the Contract – more than 9,100,000 man-hours.