291/1, Tole bi str., 050031,
Almaty, Republic of Kazakhstan

Contract “Gas Package Tranche 1&2”

Client: Agip Kazakhstan North Caspian Operating Company N.V. (Agip KCO)

General Contractor: Consortium Bonatti S.p.A – JS Company “Montazhspetsstroy” (MSS portion - 50%)

Construction area: Eskene West, Atyrau oblast, Republic of Kazakhstan

Construction period: 2007 – 2011

DETAILED SCOPE OF WORK includes, but is not limited to:

Procurement of materials, including:

Supply of materials for civil work, passive fire protection, painting, hot/cold insulation, required consumables.  

ConstructionandInstallation, including:

  • civil work (excavation and backfilling) – 90,500 m3;
  • concrete work – 6,200 m3;
  • road construction – 22,200 m2;
  • installation of reinforced concrete cable trays and drain system – 30,200 m3;
  • installation of reinforced concrete covers for cable trays – 6,800 m2;
  • erection of steel structures (including pipe supports) – 1,650 tonnes;
  • painting – 58,200 m2;
  • passive fire protection – 42,220 m2;
  • insulation (hot/cold/sound insulation) – 22,700 m2;
  • installation of equipment – 180 units / 55 tonnes;
  • installation of pipelines – 62,200 dia. inches or 38,840 linear meters;
  • number of the prepared As-built documentation under the Contract (Mechanical Completion Dossier, Quality Dossier, RoK Regulations Dossier, General Dossier) – 820 documents

Total number of man-hours completed under the Contract –  more than 7,500,000 man-hours.