Procurement, fabrication, load-out and transportation of topside for ep cluster 4

Client: North Caspian Operating Company (NCOC). 

Contractor: Consortium: “Kazakhstan Caspian Offshore Industries” (KCOI) – JS Company “Montazhspetsstroy”.

Construction area: Republic of Kazakhstan, Karabatan station, Eskene West, Atyrau oblast

Construction period: 08.06.2017 - 31.05.2021     

The Scope of Work includes:

Procurement, Fabrication, Load-out and Transportation:

  • Topside Production Manifold module;
  • Prefabricated Off Module spools and Off module items;
  • Transportation aids for the module and associated topside Off Module items.

CONNECT WITH US

Array ( [form] => tpl.AjaxForm [snippet] => FormIt [frontend_css] => [[+assetsUrl]]css/default.css [frontend_js] => [[+assetsUrl]]js/default.js [actionUrl] => [[+assetsUrl]]action.php [formSelector] => ajax_form [objectName] => AjaxForm [emailTpl] => email.tpl [hooks] => email [emailSubject] => Сообщение с сайта [emailTo] => site@mcc.kz [validate] => name:required,email:required,message:required [validationErrorMessage] => В форме содержатся ошибки! [successMessage] => Сообщение успешно отправлено )