contract nO D-EPC-8600001980 EPC DUNGA PHASE II - BUILDINGS
Client: Maersk Oil Kazakhstan GmbH
Contractor: JS Company “Montazhspetsstroy”
Construction area: Dunga Field, Tupkaraganskiy district of Mangystau oblast, RoK
Construction period: July, 2013 to May, 2016
Project “Dunga Phase II – Buildings” includes the following facilities:
- re-routing of DGA 39/40 oil line;
- workshop building for electrical/instrumentation equipment repair / Welding / Vehicles Repair, including air compression system;
- Fire Brigade Building (2 floors); Administrative facility (2 floors); Pig receiver cleaning house;
- containerized discharging propane cylinder rack;
- cabinet discharging nitrogen cylinder rack; Cabinet discharging oxygen cylinder rack;
- air compressor unit; Container laydown area;
- temporary storage area of solid domestic waste; Sewage water cleaning facilities;
- approximately 600m road (gravel) from CGF to Power Plant location, including fenced parking area (gravel) for 20 vehicles (vehicle length 18 m);
- fresh water tank and pumps;
- sewage system for all buildings;
- fencing;
- External lighting for all buildings and areas
Project Construction Scope of Work:
- earthwork;
- concrete work;
- reinforced concrete structures;
- steel structures;
- process pipeline;
- interior design;
- water supply piping and sewage system;
- ventilation and air conditioning;
- electrical;
- fire alarm;
- communication systems;
- commissioning;
- facility handover to Working Acceptance Commission