CONTRACT NO D-EPC-8600001980 “EPC DUNGA PHASE II - BUILDINGS

contract nO D-EPC-8600001980 EPC DUNGA PHASE II - BUILDINGS

Client: Maersk Oil Kazakhstan GmbH

Contractor: JS Company “Montazhspetsstroy”

Construction area: Dunga Field, Tupkaraganskiy district of Mangystau oblast, RoK

Construction period: July, 2013 to May, 2016          

Project “Dunga Phase II – Buildings” includes the following facilities:

  • re-routing of DGA 39/40 oil line;
  • workshop building for electrical/instrumentation equipment repair / Welding / Vehicles Repair, including air compression system;
  • Fire Brigade Building (2 floors); Administrative facility (2 floors); Pig receiver cleaning house;
  • containerized discharging propane cylinder rack;
  • cabinet discharging nitrogen cylinder rack; Cabinet discharging oxygen cylinder rack;
  • air compressor unit; Container laydown area;
  • temporary storage area of solid domestic waste; Sewage water cleaning facilities;
  • approximately 600m road (gravel) from CGF to Power Plant location, including fenced parking area (gravel) for 20 vehicles (vehicle length 18 m);
  • fresh water tank and pumps;
  • sewage system for all buildings;
  • fencing;
  • External lighting for all buildings and areas

Project Construction Scope of Work:

  • earthwork;
  • concrete work;
  • reinforced concrete structures;
  • steel structures;
  • process pipeline;
  • interior design;
  • water supply piping and sewage system;
  • ventilation and air conditioning;
  • electrical;
  • fire alarm;
  • communication systems;
  • commissioning;
  • facility handover to Working Acceptance Commission