291/1, Tole bi str., 050031,
Almaty, Republic of Kazakhstan
Client: Tengizchevroil LLP
Contractor: JS Company “Montazhspetsstroy”
Construction area: Tengiz field, FGP Base
Construction period: 16.07.2014 – 31.12.2017
Scope of Work:
No |
Tank |
Tank capacity,m3 |
Tank diameter, m |
Tank height, m |
Q-ty, pcs. |
1 |
Fire Water Storage Tank Т- 301А |
2110 |
13,5 |
9 |
1 |
2 |
Fire Water Storage Tank Т-7301В |
2110 |
13,5 |
9 |
1 |
3 |
Potable Water Storage Tank Т-7302 |
477 |
9 |
9 |
1 |