CONTRACT “INSTALLATION OF MAIN PIPERACKS OF OIL, GAS, SULPHUR PROCESSING FACILITY

Client: Agip Kazakhstan North Caspian Operating Company N.V. (Agip KCO)

General Contractor: Consortium Bonatti S.p.A – JS Company “Montazhspetsstroy” (MSS portion - 50%)

Construction area: Eskene West, Atyrau oblast, Republic of Kazakhstan

Construction period: 2005 – 2006

DETAILED SCOPE OF WORK includes, but is not limited to:

Procurement of materials, including:

Supply of materials for abrasive-blast cleaning and painting, fixing material  

ConstructionandInstallation, including:

  • painting of piperack steel structures – 150.000 m2;
  • erection of steel structures – 6.500 tonnes;
  • number of the prepared As-built documentation under the Contract (Quality Dossier, RoK Regulations Dossier, General Dossier) – 59 documents

Total number of man-hours liquidated under the Contract – more than 980.000 man-hours