291/1, Tole bi str., 050031,
Almaty, Republic of Kazakhstan
Client: Tengizchevroil LLP
Contractor: JS Company “Montazhspetsstroy”
Construction area: Tengiz field
Construction period: 01.12.2016 - 25.10.2019
Scope of Work:
The Integrated Operations Control Centre (IOCC) is 6,800 sq.m single storey building that will house up to twenty-eight (28) console operators complete with their line supervision and technical support staff.
The IOCC will operate twenty-four (24) hours a day, seven (7) days a week.
1. Construction of IOCC building
2. Installation of mechanical systems: redundant air systems comprising of chemical filter pressurization units, air handling units to serve all areas and local VAV reheat boxes; server and process automation equipment rooms will have dedicated computer room air conditioning units; chillers; chilled water storage and chilled water distribution pumps; installation of hot water heating with some supplemental electric resistance heating; installation of gas suppression systems for fire protection to the server rooms and under the computer flooring; installation of fire hose reels and hand held extinguishers.
3. Electrical systems: installation of indoor cast resin transformers to step down the 10 kV voltage to 380V; switch boards; standby generators on the external equipment pad; two independent uninterruptible power supplies (UPS) for server room, two additional UPS to support essential building services; all lighting in the IOCC building; fire alarm system.
4. Security and Access systems: installation of all cable infrastructure and fixings. The actual devices such as cameras, controllers, etc. will be supplied and installed by Company with the assistance of Contractor.
5. IT and Telecoms: installation of a structured cabling system in the IOCC building, wireless LAN access points, radios; underground duct banks.
6. Consoles and Automation Hardware: offloading, assembly and installation of this equipment.
7. Public Address General Alarm (PAGA): installation of PAGA speakers and cabling.
8. General furniture: The fully assembled furniture will be supplied by Company. Placement will be according to the layout highlighted on the drawings, final connections for electrical and data systems.